Construction and Other Notice

  • May 18, 2025 - July 17, 2026: McGaugh Hall, Lab 2419 & 2426 - Construction Noise, Dust and Fumes - Scheduled to begin daily at 5 a.m., ending at approximately 3 p.m.
  • June 1, 2026 - July 24, 2026: Edward Shanbrom Hall (Bldg. 55), Room #060 - Construction Noise, Dust and Vibration - Scheduled to begin daily at 5 a.m., ending at approximately 3 p.m.
  • June 1, 2026 - July 31, 2026: BC Cavern Deck Construction - Construction Noise, Dust & Traffic - Scheduled to begin daily at 5 a.m., ending at approximately 12:30 p.m.
  • June 8, 2026 - July 22, 2026: Natural Sciences I, Room 2443 &2443A - Construction Noise, Dust and Fumes - Scheduled to begin daily at 7 a.m., ending at approximately 3:30 p.m.
  • June 10, 2026 - September 18, 2026: Rowland Hall, 4th Floor - Construction Noise, Dust, Vibration and Temporary Utility Outages - Scheduled to begin daily at 5 a.m., ending at approximately 1:30 p.m.
  • June 13, 2026 - September 18, 2026: MSTB, 1st Floor - Construction Noise, Dust, Vibration, Odors and Temporary Utility Outages - Scheduled to begin daily at 5 a.m., ending at approximately 1:30 p.m.
  • June 22, 2026 - July 24, 2026: ANTrepreneur Center, Exterior Stairwell Closure - Construction Noise and Dust - Scheduled to begin daily at 7 a.m., ending at approximately 5 p.m.
  • June 29, 2026 - August 10, 2026: Engineering Trailers Demo - Construction Noise, Dust and Fumes - Scheduled to begin daily at 7 a.m., ending at approximately 3:30 p.m.
  • July 14, 2026: Medical Surge II - Building-wide shutdown Compressed Air, Natural Gas and Industrial Cold Water - Scheduled to begin at 4 a.m., ending at approximately 7 a.m.

Domestic and/or Industrial Water Shutdowns

  • June 25, 2026: Rowland Hall - Electrical/Lighting Power Outage, Floors 2-5 - Scheduled to begin at 4 a.m., ending at approximately 6 a.m.
  • June 27, 2026 - June 28, 2026: Multiple Buildings -High Temp Water Outage - Scheduled to begin daily at 2 a.m. on 6/27, ending at approximately 5 p.m on 6/28.

Elevator Outage

  • No outages scheduled at this time.

Gas Outage

  • No outages scheduled at this time.

HVAC Outage

  • No outages scheduled at this time.

Planned Power Outage

  • July 9, 2026: Receiving Bldg. - Panel G - Scheduled to begin at 5 a.m., ending at approximately 7 a.m.
  • July 10, 2026: Receiving Bldg. - Panel C - Scheduled to begin at 5 a.m., ending at approximately 7 a.m.