Project Name | CTSA Instructional Spaces Phase 2: Little Theatre and Nixon Theatre & CTSA Instructional Spaces Phase 3: Winifred Smith Hall |
Project Number | 5112853 & 5113125 (Announcement) |
Estimated Construction Cost | $1,340,000 & $860,000 |
Due Date | November 27, 2024 by 2:00pm |
Contact Person | Brenda Medina |
Status | Send requests for Bid Documents to contact person(s) listed. |
Project Name | BLI Lab R-120 Exhaust Fan Replacement |
Project Number | 5113049 (Announcement) |
Estimated Construction Cost | $265,000 |
Due Date | November 21, 2024 by 2:00pm |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | SB-1 1st Floor Classroom Renovation |
Project Number | 5112904 (Announcement) |
Estimated Construction Cost | $600,000 |
Due Date | August 16, 2024 by 2:00pm |
Contact Person | Ladita McBride |
Status | Send requests for Bid Documents to contact person(s) listed. |
Prequalification Opportunities
Project Name | Job Order Contract - Small Construction & Maintenance & Service Work |
Project Delivery | Job order contract (Announcement) |
Mandatory Conference Date | December 3, 2024 at 11:00 am |
Due Date | December 13, 2024 at 5:00 pm |
Estimated Construction Cost | $25,000 (minimum) to $5,000,000 (maximum) |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name | Job Order Contract - Small Construction & Maintenance Projects for Housing, Project No. 5112021 |
Project Delivery | Job order contract (Announcement) |
Mandatory Conference Date | December 3, 2024 at 9:00 am |
Due Date | December 13, 2024 at 5:00 pm |
Estimated Construction Cost | $500 (minimum) to $5,000,000 (maximum) |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name | Student Center Plaza Seismic Joint Repair, Student Center Fan Coil 1-10 Replacement, GENERAL CONTRACTORS (B License) |
Project Number | 5112834 & 5112956 (Announcement) |
Mandatory Conference Date | October 18, 2024 at 10:00 am |
Due Date | October 28, 2024 at 5:00 pm |
Estimated Construction Cost | $1,590,000 & $457,500 |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name | Job Order Contract - Small Construction & Maintenance Projects for Housing, Project No. 5112021 |
Project Delivery | Job order contract (Announcement) |
Mandatory Conference Date | October 17, 2024 at 11:00 am |
Due Date | November 1, 2024 at 5:00 pm |
Estimated Construction Cost | $500 (minimum) to $5,000,000 (maximum) |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed, or navigate to the link on the Invitation for Prequalification |
Project Name |
Student Center Fan Coil 1-10 Replacement - HVAC SUBCONTRACTORS (C20 License) |
Project Number | 5112956 (Announcement) |
Mandatory Conference Date | September 23, 2024 at 10:00am |
Due Date | October 7, 2024 at 5:00 pm |
Estimated Construction Cost | $457,500 |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Rowland Hall 5th Floor Chemistry Lab Renovations |
Project Number | 5113050 (Announcement) |
Mandatory Conference Date | Septmeber 12, 2024 at 10:00 am |
Due Date | September 25, 2024 at 5:00 pm |
Estimated Construction Cost | $600,000 |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Job Order Contract - Hazardous Material Abatement |
Project Number | 5112021 (Announcement) |
Mandatory Conference Date | September 4, 2024 at 1:00pm |
Due Date | September 20, 2024 at 5:00 pm |
Estimated Construction Cost | $25,000 - $2,000,000 |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person(s) listed. |
Project Name |
SC 22-23 CTSA - BUILDING SECURITY ENHANCEMENTS SC 22-23 ICS-1 - BUILDING SECURITY ENHANCEMENTS SC 22-23 LAW, ED. & MPAA BLDGS. - BUILDING ENHANCEMENTS |
Project Number | 5112903 & 5112908 & 5112909 (Announcement) |
Mandatory Conference Date | June 20, 2024 at 9:30 am |
Due Date | July 8, 2024 at 5:00 pm |
Estimated Construction Cost | $584,173 & $577,727 & $537,727 |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | CTSA Instructional Spaces Phase 2: Little Theatre and Nixon Theatre & CTSA Instructional Spaces Phase 3: Winifred Smith Hall |
Project Number | 5112853 & 5113125 (Announcement) |
Mandatory Conference Date | May 16, 2024 at 11:00 am |
Due Date | May 31, 2024 at 5:00 pm |
Estimated Construction Cost | $1,300,000 & $840,000 |
Contact Person | Brenda Medina |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Med Surge 1 & 2 HVAC Repairs |
Project Number | 5112640 (Announcement) |
Mandatory Conference Date | April 25, 2024 at 11:00 am |
Due Date | May 8, 2024 at 5:00 pm |
Estimated Construction Cost | $950,000 |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Engineering Tower MAQ |
Project Number | 5112761 (Announcement) |
Mandatory Conference Date | March 14, 2024 at 10:00 am |
Due Date | April 3, 2024 at 5:00 pm |
Estimated Construction Cost | $2,500,000 - $3,000,000 |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | SSOE Accelerated Labs ET 9th Floor |
Project Number | 5112808 (Announcement) |
Mandatory Conference Date | November 28, 2023 at 9 a.m. |
Due Date | December 13, 2023 by 5 p.m. |
Estimated Construction Cost | $2,240,000 |
Contact Person | Brenda Medina |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Student Center Catering Kitchen Exhaust - HVAC SUBCONTRACTORS (C20 License) |
Project Number | 5112855 (Announcement) |
Estimated Construction Cost | $996,000 |
Due Date | November 22, 2023 by 5 p.m. |
Contact Person | Abel Saldana |
Status | Addendum No.1 Send requests for required forms to contact person(s) listed. |
Project Name | Student Center Catering Kitchen Exhaust - GENERAL CONTRACTORS (B License) |
Project Number | 5112855 (Announcement) |
Estimated Construction Cost | $996,000 |
Due Date | November 22, 2023 by 5 p.m. |
Contact Person | Abel Saldana |
Status | Addendum No.1 Send requests for required forms to contact person(s) listed. |
Project Name | Metal Bridges Painting Treatment - Phase 2 |
Project Number | 5112736 (Announcement) |
Mandatory Conference Date | October 2, 2023 at 1:30 p.m. |
Submittal Due Date | October 16, 2023 at 5 p.m. |
Estimated Construction Cost | $1,300,000 |
Contact Person | Brenda Medina |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Gateway Ramps - Langson Library & Aldrich Hall |
Project Number | 999608 (Announcement) |
Mandatory Conference Date | July 17, 2023 at 10 a.m. |
Submittal Due Date | August 4, 2023 at 5 p.m. |
Estimated Construction Cost | $1,357,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Med Sci D356 Modular Clean Room |
Project Number | 5112471 (Announcement) |
Mandatory Conference Date | June 26, 2023 at 10 a.m. |
Submittal Due Date | July 12, 2023 at 5 p.m. |
Estimated Construction Cost | $770,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | ADA Handrail & Stair Upgrades - Multiple Buildings & DM 22-23 Exterior Stairwell Coating |
Project Number | 5112608 & 5112938 (Announcement) |
Mandatory Conference Date | June 12, 2023 at 10:30 a.m. |
Submittal Due Date | July 6, 2023 at 5 p.m. |
Estimated Construction Cost | $604,445 & $595,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Physical Sciences Chemical Storage Rooms |
Project Number | 5112376 (Announcement) |
Mandatory Conference Date | June 13, 2023 at 10 a.m. |
Submittal Due Date | June 30, 2023 at 5 p.m. |
Estimated Construction Cost | $785,000 |
Contact Person | Gustavo Valle |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Palo Verde Grad Housing Wireless Network |
Project Number | 5112791-A (Announcement) |
Mandatory Conference Date | April 25, 2023 at 9 a.m. |
Submittal Due Date | May 15, 2023 at 5 p.m. |
Estimated Construction Cost | $3,000,000 |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Project Name | Verano Place Grad Housing Wireless Network |
Project Number | 5112791-B (Announcement) |
Mandatory Conference Date | April 25, 2023 at 9 a.m. |
Submittal Due Date | May 15, 2023 at 5 p.m. |
Estimated Construction Cost | $3,750,000 |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person(s) listed. |
Request for Qualifications (RFQ) for Professional Services
Project Name | Programming & Cost Estimating Services (Announcement) |
Submittal Due Date | October 24, 2024 at 4 p.m. |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person listed above. |
Project Name | 2024-2026 Energy Consulting Services (Announcement) |
Submittal Due Date | August 5, 2024 at 2 p.m. |
Contact Person | Ladita McBride |
Status | Send requests for required forms to contact person listed above. |
Project Name | Building Technology and Forensic Consulting Services (Announcement) |
Submittal Due Date | June 24, 2024 at 5 p.m. |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person listed above. |
Project Name | Mechanical, Electrical, and Plumbing (MEP) Design Services (Announcement) |
Submittal Due Date | April 8, 2024 at 2 p.m. |
Contact Person | Viola Teoxon |
Status | Send requests for required forms to contact person listed above. |
Project Name | Below Grade Waterproofing Parkview and Summer Session B (Announcement) |
Submittal Due Date | September 5, 2023 at 2 p.m. |
Contact Person | Abel Saldana |
Status | Send requests for required forms to contact person listed above. |
Recent Bid Results
Project Name | BLI Lab R-120 Exhaust Fan Replacement |
Project Number | 5113049 |
Estimated Construction Cost | $265,000 |
Due Date | November 21, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Student Center Catering Kitchen Exhaust |
Project Number | 5112855 |
Estimated Construction Cost | $996,000 |
Due Date | April 19, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | ICS 1 and 2 Renovation |
Project Number | 5112999 |
Estimated Construction Cost | $1,350,000 |
Due Date | June 25, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Med Surge 1 and 2 HVAC Repairs |
Project Number | 5112640 |
Estimated Construction Cost | $950,000 |
Due Date | June 24, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Anteater Stadium Landscape and Hardscape Improvements |
Project Number | 5112769 |
Estimated Construction Cost | $1,600,000 |
Due Date | June 26, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Verano Place Grad Housing Wireless Network |
Project Number | 5112791-B |
Estimated Construction Cost | $3,500,000 |
Due Date | August 27, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | ICS Emergency Generator Replacement |
Project Number | 5112896 |
Estimated Construction Cost | $300,000 |
Due Date | November 20, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Job Order Contract - Hazardous Materials Abatement |
Project Number | 5112021 |
Estimated Construction Cost | $2,000,000 |
Due Date | November 12, 2024 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | ADA Upgrade - Signage and Door Hardware |
Project Number | 5112607 |
Estimated Construction Cost | $390,000 |
Due Date | November 19, 2024 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | SC 22-23 ICS-1 - Building Security Enhancements |
Project Number | 5112908 |
Estimated Construction Cost | $577,727 |
Due Date | September 30, 2024 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | Aldrich Hall ADA Ramp |
Project Number | 5112740 |
Estimated Construction Cost | $230,000 |
Due Date | October 30, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | UCI Learning Landscapes - Santa Ana Madison & Angels Parks |
Project Number | 5113149 |
Estimated Construction Cost | $150,000 |
Due Date | October 18, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Verano Place Grad Housing Wireless Network |
Project Number | 5112791-B |
Estimated Construction Cost | $3,500,000 |
Due Date | August 27, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Plumwood House 323 Autoclave Installation |
Project Number | 5113000 |
Estimated Construction Cost | $40,000 |
Due Date | Septmeber 19, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | SB-1 1st Floor Classroom Renovation |
Project Number | 5112904 |
Estimated Construction Cost | $600,000 |
Due Date | August 16, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Building Safety Mitigation Phase-4 |
Project Number | 5112277 |
Estimated Construction Cost | $600,000 |
Due Date | August 19, 2024 by 2 p.m. |
Contact Person | Ladita McBride |
Status | Notice of Intent to Award |
Project Name | Med Surge 1 & 2 HVAC Repairs |
Project Number | 5112640 |
Estimated Construction Cost | $950,000 |
Due Date | July 9, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | ICS 1&2 Renovation |
Project Number | 5112999 |
Estimated Construction Cost | $1,350,000 |
Due Date | July 2, 2024 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Med Sci D356 Modular Clean Room |
Project Number | 5112471 |
Estimated Construction Cost | $776,000 |
Due Date | November 20, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Grad Housing Wireless Network |
Project Number | 5112791 |
Estimated Construction Cost | $3,000,000 |
Due Date | October 19, 2023 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Crawford Athletic Complex Pathways |
Project Number | 5112766 |
Estimated Construction Cost | $485,000 |
Due Date | May 15, 2024 by 2:00pm |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | Fresh Hub Student Service West Roofing |
Project Number | 5112893 |
Estimated Construction Cost | $270,000 |
Due Date | May 6, 2024 by 2:00pm |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Metal Bridges Painting Treatment Phase 2 |
Project Number | 5112736 |
Estimated Construction Cost | $1,300,000 |
Due Date | April 8, 2024 by 2:00pm |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Law Library Restroom Renovation |
Project Number | 5112803 |
Estimated Construction Cost | $280,000 |
Due Date | March 18, 2024 by 2:00pm |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | ADA Handrail & Stair Upgrades - Multiple Buildings |
Project Number | 5112608 |
Estimated Construction Cost | $604,445 |
Due Date | October 20, 2023 by 2:00pm |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | SCIP 21/22: McGaugh Hall 3416/3445 Aquatic Lab |
Project Number | 5112723 |
Estimated Construction Cost | $350,000 |
Due Date | December 13, 2023 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | Med Sci D356 Modular Clean Room |
Project Number | 5112471 |
Estimated Construction Cost | $776,000 |
Due Date | November 20, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Student Center East & West Food Court Flooring Renovation |
Project Number | 5112984 |
Estimated Construction Cost | $150,000 |
Due Date | November 20, 2023 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | DM 22-23 Exterior Stairwell Coating |
Project Number | 5112938 |
Estimated Construction Cost | $595,000 |
Due Date | October 20, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Humanities Gateway & HIB GIF Restrooms |
Project Number | 5112752 |
Estimated Construction Cost | $350,000 |
Due Date | October 11, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Grad Housing Wireless Network |
Project Number | 5112791 |
Estimated Construction Cost | $3,000,000 |
Due Date | October 19, 2023 by 2 p.m. |
Contact Person | Abel Saldana |
Status | Notice of Intent to Award |
Project Name | SCIP 21/22 - Calit2 Floor 3 - RCIC |
Project Number | 5112782 |
Estimated Construction Cost | $394,000 |
Due Date | October 17, 2023 by 2 p.m. |
Contact Person | Viola Teoxon |
Status | Notice of Intent to Award |
Project Name | Bren Event Center - HVAC Modernization |
Project Number | 5112512 |
Estimated Construction Cost | $3,150,000 |
Due Date | September 22, 2023 by 2 p.m. |
Contact Person | Brenda Medina |
Status | Notice of Intent to Award |
Project Name | Data Center Lab C HX Cooling Unit Addition |
Project Number | 5112901 |
Estimated Construction Cost | $52,000 |
Due Date | October 5, 2023 by 2 p.m. |
Contact Person | Gustavo Valle |
Status | Notice of Intent to Award |
Project Name | Air Handler Replacements 2023 |
Project Number | 5112867 (Announcement) |
Project Delivery Method | Design Build |
Submittal Due Date | BAFO - Technical Proposal: August 4, 2023; 2 p.m. BAFO - Lump Sum Base Proposal: August 4, 2023; 2 p.m. |
Maximum Acceptance Cost | $7,846,612 |
Contact Person | Gustavo Valle |
Contact Person | Gustavo Valle |
Prequalified Proposers | MESA ENERGY SYSTEMS, INC., Irvine, CA 92602, 949-460-0460 PPC AIR CONDITIONING, INC., Cypress, CA 90630, 714-952-2100 XCEL MECHANICAL SYSTEMS, INC., Gardena, CA 90249, 310-660-0090 |
Status | Notice of Intent to Award |
Project Name | Crawford Hall Gym Floor Replacement |
Project Number | 5112758-A |
Estimated Construction Cost | $650,000 |
Due Date | April 13, 2023 by 2 p.m. |
Contact Person | Gustavo Valle |
Status | Notice of Intent to Award |
Project Name | State Funds 2021 Building Envelope, SLH, CTT, Studio 4 & HH |
Project Number | 5112810 (Announcement) |
Project Delivery Method | Design Build |
Submittal Due Date | Technical Proposal: March 24, 2023; 4 p.m. Lump Sum Base Proposal: March 24, 2023; 4 p.m. |
Maximum Acceptance Cost | $9,276,642 |
Contact Person | Gustavo Valle |
Due Date | PPC AIR CONDITIONING, INC., Cypress, CA 90630, 714-952-2100 THE WHITING-TURNER CONTRACTING COMPANY, Irvine, CA 92602, 949-863-0800 |
Status | Notice of Intent to Award |
Project Name | EG 2118 Fumehood |
Project Number | 5112821 |
Estimated Construction Cost | $175,000 |
Due Date | February 16, 2023 at 2 p.m. |
Contact Person | Rosa Hernandez |
Status | Notice of Intent to Award |
Project Name | Crawford Hall Gym Floor Replacement |
Project Number | 5112758 |
Estimated Construction Cost | $350,000 |
Due Date | February 9, 2023 at 2 p.m. |
Contact Person | Gustavo Valle |
Status | Notice of Intent to Award |